Springfield Catholic High School Additions
Location: Springfield, Missouri
Owner: Springfield Catholic High School

This addition and renovation to the existing Springfield Catholic High School includes new science classrooms, administration offices, and a cafeteria. The school received a newly renovated gymnasium and new additions wrapping around on three sides of the existing building.

The main entrance to the school now has a masonry-built 40 ft. bell tower with a cross. A new heating-and-air-conditioning system, a fire sprinkler system, new lighting, and new floor & wall finishes were also added. The building is 80,000 square ft. and is designed with a structural steel frame with a masonry stone, block and brick exterior. A separate 10,000 square foot fieldhouse building, including lockers, showers, and a concession kitchen, was added to the sports complex.